MIL-S-62549(AT)
TABLE V. Location for tests - Continued.
Title of test |
Requirement |
Test Paragraph |
Place of manufacture |
Government Test site |
|
Acceptance |
Control |
||||
Outriggers Folding gooseneck Intervehicular connections Electrical system check Electrical systems Lubrication Rustproofing Wood treatment Welding Painting and marking check Polyurethane paint inspection method Marking check Data plates check Transportability provision check Transportability provisions Turning ability test Tracking ability test Articulation test Dimension and clearance inspection Rear and side Loading test Front loading test Climatic tests Compatibility test Side slope test Fording test |
3.4.19 3.4.7, 3.5.7 3.4.14.2 3.4.16 thru 3.4.16.3 3.4.16 thru 3.4.16.3 3.11.1, 3.12 3.8 3.4.8 3.9 3.7, 3.7.1, 3.10 thru 3.10.4 4.7.26 3.10 thru 3.10.4 3.11 3.4.17, 3.4.17.1 3.4.17.4 3.4.17 thru 3.4.17.4 3.5.2 3.5.6 3.4.13.5 3.4.1, 3.4.1.1, 3.4.10, 3.4.11, 3.4.11.1 3.5.8 3.4, 3.4.7, 3.5.7 3.2.2 3.2.1, 3.4 3.4.1, 3.4.1.1 3.4.21, 3.5.8, 6.1 3.5.3 3.5.4 |
4.7.18 4.7.19 4.7.20 4.7.21 4.7.21.1 4.7.22 4.7.23 4.7.24 4.7.25 4.7.26 4.7.26.1 4.7.27 4.7.28 4.7.29 4.7.29.1 4.7.30 4.7.31 4.7.32 4.7.33 4.7.34 4.7.35 4.7.36 4.7.37 4.7.38 4.7.39 |
x x x x x x x x x x x x x x |
x x x x x x x x x x x |
x x x x x x x x x x x x x x x x x x x |
23
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business