MIL-PRF-46756E(AT)
4.2.2 Initial production vehicle test. After completion of preliminary inspection of the
first semitrailer, the second and third produced shall be subjected to examination and tests
specified herein and the 8000 mile test specified in table II.
TABLE II. 8000 mile test.
Course
Mileage and speeds
40% up to 50 mph maximum
High speed paved road
(APG Munson Test Area)
27% up to 25 mph maximum
Improved gravel road
(APG Munson Test Area)
25% up to 15 mph maximum
Cross-country terrain
(Perryman Course)
No. 1 secondary roads
(APG Perryman Test Area)
6% up to 15 mph maximum
Hilly secondary road
(Churchville Test Course C)
2% up to 15 mph maximum
Belgian block
(APG Munson Test Area)
4.3 Conformance inspection. Conformance inspection shall include the examinations of
4.4 and the tests in accordance with table IV.
4.3.1 Sampling. Samples from an inspection lot for conformance inspection shall be
selected in accordance with ANSI/ASQC Z1.4.
4.4 Examinations. Visual, dimensional, and primary functional examination shall be
performed on each semitrailer for conformance to the technical data package and this
specification. A minimum of examination shall be performed against the classification of defects
shown in table III. Any redesign or modification of the contractor's standard product to comply
with specified requirements, or any necessary redesign or modification following failure to meet
the specified requirements shall receive particular attention for adequacy and suitability. This
element of inspection shall encompass all visual examinations and dimensional measurements.
Noncompliance with any specified requirements or presence of one or more defects preventing or
lessening maximum efficiency shall constitute cause for rejection.
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business