MIL-DTL-62049G
TABLE IV. Classification of inspections Continued.
Longitudinal grades
3.6.10.1
4.5.11.1
X
X
Side slopes
3.6.10.2
4.5.11.2
X
X
Electromagnetic
3.7
4.5.12
X
X
compatibility
Painting
3.8
4.5.16
X
X
X
Safety
3.11
4.5.17
X
X
X
4.2.1 FPVI. Unless otherwise specified (see 6.2), first article FPVI shall be performed
on the first production semitrailer of each model on each contract.
4.2.2 IPT. Unless otherwise specified (see 6.2), first article IPT shall be performed on
two semitrailers selected from the first months production.
4.3 Conformance inspection.
4.3.1 Sampling. Samples from an inspection lot for conformance inspection shall be
selected in accordance with ANSI/ASQC Z1.4.
4.4 Examination. Each semitrailer shall be examined for compliance with the
requirements specified in 3.2 through 3.3.7 and 3.8 through 3.12. Any redesign or modification
of the contractor s standard product to comply with specified requirements, or any necessary
redesign or modification following failure to meet the specified requirements shall receive
particular attention for adequacy and suitability. This element of inspection shall encompass all
visual examinations and dimensional measurements. Noncompliance with any specified
requirements or presence of one or more defects preventing or lessening maximum efficiency
shall constitute cause for rejection.
4.5 Methods of inspection.
4.5.1 Materials and construction. Conformance to 3.2 through 3.3 shall be determined
by inspection of contractor records providing proof or certification that design, construction,
processing, and materials conform to requirements. Applicable records shall include drawings,
specifications, design data, receiving inspection records, processing and quality control
standards, vendor catalogs and certifications, industry standards, test reports, and rating data.
4.5.2 Defects. Conformance to 3.3.1 through 3.4, 3.6.3, 3.6.5 through 3.6.7, 3.6.9.1
through 3.6.9.3, 3.8 through 3.10, 3.11, 3.12 and 3.13 shall be determined by examination for the
defects listed in table III. Examination shall be visual, tactile, or by measurement with a
hydrometer.
4.5.3 Seals. To determine conformance to 3.3.1, during operation and after the
6000 mile test (see 4.5.8.1), examine the semitrailer external bearing areas for evidence of
lubricant leakage. Immediately after performing the fording test (see 4.5.10.4), remove the
15