MIL-S-62095C(AT)
time sufficient to stabilize the temperature of the resistor assembly for not less than 30 minutes in an ambient temperature of not less than 25 C (77 F). After the test, the resistor assembly, including resistors, wiring and adjacent components shall be examined for evidence of overheating, deterioration or damage.
* 4.3.9 Lifting and tiedown test. Lifting and tiedown provisions, markings, and the connecting structural members of the vehicle shall be inspected for conformance with MIL-STD-209. All lifting and tiedown provisions and the connecting structural members shall meet the criteria of
MIL-STD-209. Test results that show the provisions do not meet the criteria of MIL-STD-209 shall constitute failure of this test.
4.3.10 Type I pump test. Type I semitrailer pumping equipment shall be tested by loading and unloading the tank under the conditions and at the flow rate specified in 3.16.1.1 and
3.16.1.2.
4.3.11 Type II loading and unloading test. Type II semitrailer shall be loaded and unloaded at the rate of up to 948 L/min (250 gpm). The fire hose connections, valves, and piping shall be tested by a fire truck or suitable pump drawing from the semitrailer while pumping at 948 L/min (250 gpm). Failure of the suction connections to deliver a water flow of 948 L/min (250 gpm), failure to deliver the complete contents of the tank, or damaged piping or a damaged tank due to vacuum pressure shall be cause for rejection.
* 4.3.12 Certification. When an air suspension system is furnished, the contractor shall certify capability of the system to operate over the temperature range specified in 3.8.1.
* 4.3.13 Production sample. Upon acceptance of the first production vehicle, it shall remain at the manufacturing facility as a production sample and shall be the last vehicle shipped on the contract. The manufacturer shall maintain the vehicle in an as new condition for the duration of the contract. Release of the first vehicle for shipment prior to completion of the contract shall be at the discretion of the local Government Quality Assurance Representative (QAR).
* 4.3.14 Failure. Failure of the first production vehicle to meet requirements of the contract shall be cause for the Government to refuse acceptance of all vehicles under contract until corrective action has been taken.
* 4.4 Inspection of production vehicles. The contractor's inspection system shall, as a minimum, assure that the vehicle conforms to the physical and dimensional requirements and is capable of meeting the performance requirements contained herein. All semitrailers under contract shall be tested as specified in 4.3.2. For each vehicle under contract, the contractor shall
25
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business