MIL-DTL-62164E(AT)
a. Load and evacuate disabled vehicles from a vehicle collection point, and
thereafter unload them.
b. Make short detours to avoid road obstruction.
c. Negotiate bypasses.
d. Negotiate temporary engineer bridging, be compatible with engineer ferries
access routes thereto.
e. Reach vehicle parks and areas for concealment.
The vehicle, with the prime mover, will be a self-contained complete unit capable of normal field
use by the crew in combat under all conditions of weather and visibility. Design features will not
compromise operational characteristics needed for combat support operations.
6.2 Acquisition requirements. Acquisition documents must specify the following:
a. Title, number, and date of this specification.
b. If required, the specific issue of individual documents referenced (see 2.2.1, 2.2.2,
and 2.3).
c. If first article inspection (preproduction or initial) is not required (see 3.1).
d. List of BII (see 3.3.6).
e. If BII is furnished (see 3.3.6).
f. If painting procedures and color of paint is other than as specified (see 3.6).
g. If first article inspection is specified (see 4.2).
h. If preproduction inspection is specified (see 4.2.1).
i. If initial production inspection is specified (see 4.2.2).
j. Packaging requirements (see 5.1).
6.3 Subject term (key word) listing.
4 axle
16 wheel
M60
Engineer
Recovery
Tank
Tractors
Vehicles
6.4 Changes from previous issue. Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
17
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business