MIL-DTL-45150L
6.3 First article preproduction. When requiring a first article inspection, contracting
documents should provide specific guidance to offerors. This guidance should cover whether the
first article is a first article sample, a first production item, or the number of test items. These
documents should also include specific instructions regarding arrangements for examinations,
approval of first article test results, and disposition of first articles. Pre-solicitation documents
should provide Government waiver rights for samples for first article inspection to bidders
offering a previously acquired or tested product. Bidders offering such products who wish to rely
on such production testing must furnish evidence with the bid that prior Government approval is
appropriate for the pending contract.
6.4 Conformance inspection. Affordable conformance inspection with confidence varies
depending upon a number of procurement risk factors. Some of these factors include: Contractor
past performance, Government schedules and budget, product material and design maturity,
manufacturing capital equipment and processes applies, the controlled uniformity of those
processes, labor skill and training, and the uniformity of measuring processes and techniques.
During the solicitation, contracting documents should indicate those tests desired from table IV
and their designated frequency based on a risk assessment for the procurement.
6.5 Pin structure. The PINs to be used for chassis acquired by this specification are
created as follows:
M
45150 - XX
Model number
(See table V and 1.2).
Specification number
M prefix.
TABLE V. PIN assignment.
PIN number
PIN number
M45150-
Model
M45150-
Model
01
M569A1
09
M492A1
02
M569A2
10
XM580
03
M116A2E1
11
M390
04
M116A3
12
M390C
05
M514
13
M200A1
06
XM545
14
M537
07
M103A3
15
M353
08
M103A4
16
M536
16
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business